Project Management Network Diagram

Network Diagram
Complete Exercise 3, a through d, on page 229 of the course textbook. Consider Figure 5-28. All duration estimates are in days, and the network proceeds from Node 1 to Node 9. A. Draw an AOA network diagram representing the project.
Put the node numbers in circles and draw arrows from node to node, labeling each arrow with the activity letter and estimated duration. Add a tenth node with one day with your last name.
Identify all the paths on the network diagram and note how long they are.
What is the critical path for this project, and how long is it?
What is the shortest possible time it will take to complete this project?
The assignment must be two to three double-spaced pages in length (not including title and references pages) and formatted according to APA style as outlined in the Writing
Center (Links to an external site.).
Must include a separate title page with the following:
Title of paper
Student’s name
Course name and number
Instructor’s name
Date submitted
Must document all sources in APA style as outlined in the Writing Center.
Must include a separate references page that is formatted according to APA style as outlined in the Writing Center.
Carefully review the Grading Rubric (Links to an external site.) for the criteria that will be used to evaluate your assignment.

Place this order or similar order and get an amazing discount. USE Discount code “GET20” for 20% discount